For construction and manufacturing workers attending the high-risk specific training module (12 hours): construction sites, falls from height, machines, confined spaces, electrical risk. 14 questions, about 9 minutes. Translated from Italian: legal references remain the Italian ones (D.Lgs. 81/2008) Sources: D.Lgs. 81/2008 arts. 37, 66, 82, 83, 136; Accordo Stato-Regioni 21/12/2011; D.P.R. 177/2011; CEI 11-27 · Reviewed 21/10/2026 · Training support, not a certification.

Practise now

Also available in: Spanish, Romanian, French, Italian, German

Quiz questions

Question 1 · Single choice · 30s · 1 pt

How many hours of specific training does the State-Regions Agreement provide for workers in high-risk companies?

  • 4 hours
  • 32 hours
  • 12 hours
  • 8 hours

Question 2 · Single choice · 30s · 1 pt

According to art. 107 of D.Lgs. 81/08, when does work at height apply?

  • Only above 5 metres
  • From 50 centimetres upwards, in any case
  • When the worker is exposed to the risk of falling from a height of more than 2 metres above a stable surface
  • Only on roofs

Question 3 · Single choice · 30s · 1 pt

Who draws up the Safety and Coordination Plan (PSC)?

  • The works director (direttore dei lavori)
  • The ASL (local health authority)
  • Each contractor
  • The safety coordinator for the design phase (CSP)

Question 4 · Single choice · 30s · 1 pt

What is the POS?

  • The general plan drawn up by the client for all contractors
  • The register of medical examinations on the site
  • The operational safety plan that each contractor draws up for the individual site
  • The building permit issued by the municipality

Question 5 · Single choice · 30s · 1 pt

When must the client appoint the design-phase coordinator?

  • Only for public works
  • Never: the main contractor appoints them
  • When the presence of more than one contractor is expected on the site, even if not at the same time
  • Only on sites over 200 man-days

Question 6 · Single choice · 30s · 1 pt

What minimum height must a standard guardrail against falls into the void have?

  • 1 metre
  • 60 centimetres
  • 80 centimetres
  • 1.5 metres

Question 7 · Single choice · 30s · 1 pt

Which system protects against falls from height when collective protection is not possible?

  • Safety shoes with a non-slip sole
  • A full-body harness connected to a secure anchor point with a lanyard and energy absorber
  • A waist work-positioning belt without an anchor
  • A helmet with a chin strap

Question 8 · Single choice · 30s · 1 pt

What is the PiMUS?

  • The permit for electrical work
  • The scaffolding assembly, use and dismantling plan
  • The machine maintenance plan
  • The training programme for supervisors (preposti)

Question 9 · True / False · 20s · 1 pt

Erecting and dismantling scaffolding may only be carried out by workers who have received specific training.

  • True
  • False

Question 10 · Single choice · 30s · 1 pt

A workpiece gets jammed between the moving parts of a machine. What do you do?

  • Remove the piece by hand with the machine running, being careful
  • Keep working until the piece comes free on its own
  • Take off the guard and use a tool while the machine turns slowly
  • Stop the machine and make it safe before intervening, following the procedures

Question 11 · Single choice · 30s · 1 pt

On a sewer site a colleague loses consciousness in a manhole. What is the correct reaction?

  • Go down immediately to get them, holding your breath
  • Lower an FFP2 dust mask to your colleague
  • Wait for them to recover on their own
  • Do not enter without protection: raise the alarm and activate the rescue procedure with breathing apparatus and recovery equipment

Question 12 · Single choice · 30s · 1 pt

In electrical work under the CEI 11-27 standard, what does the abbreviation PES mean?

  • Skilled person in the electrical field (persona esperta)
  • Emergency and rescue plan
  • Safety expert supervisor
  • External supervision person

Question 13 · Multiple choice · 45s · 1 pt

Which documents or roles concern the safety of temporary or mobile construction sites? (2 answers)

  • The preliminary notification sent before work begins
  • The execution-phase safety coordinator (CSE)
  • The GDPR record of processing activities
  • The HACCP self-monitoring manual

Question 14 · Single choice · 30s · 1 pt

Why is practical training in the use of the fall-arrest harness mandatory?

  • Because the supplier requires it
  • It is not mandatory: reading the information leaflet is enough
  • Because it is a category III PPE, which protects against risks of death or serious and irreversible harm
  • Because it costs more than other PPE

How to use it

Copy the quiz into your free account, edit it if needed and run it live: players join from their phones with a code or a QR code, no app needed. The correct answers are not published here: you see them in your copy.

Related quizzes

Report this quiz

If you leave your email we confirm receipt and tell you our decision. To report child sexual abuse material you do not need to say who you are.